Quick Answer: Construction firms can claim when the work sought a technological advance that competent engineers could not readily deduce, such as a new structural, ground, thermal or building-services approach. Building to a normal specification does not qualify. Who claims often turns on the contract, because generally only the party that decided to undertake the R&D can claim.
How much R&D tax relief does construction claim?
HMRC assigns each claim to a sector using the company's registered primary SIC code, so these figures cover companies classed as construction, not every company that builds. Design practices and developers may sit in other sectors. The release is HMRC, Research and Development Tax Credits Statistics, September 2026; 2024 to 2025 is provisional and uplifted for claims not yet received, and all figures are rounded by HMRC to the nearest 5 or £5 million.
| Financial year | Construction claims | Cost of relief | R&D expenditure |
|---|---|---|---|
| 2021 to 2022 | 8,140 | £530m | £2,905m |
| 2022 to 2023 | 5,815 | £445m | £2,570m |
| 2023 to 2024 | 3,585 | £375m | £2,340m |
| 2024 to 2025 | 2,405 | £390m | £2,510m |
Source: HMRC, Research and Development Tax Credits Statistics, September 2026, table RD6. Claim numbers have fallen every year while the cost of relief has held between £375 million and £530 million, so claims are getting larger on average. Large companies make up about 12% of 2024 to 2025 construction claims (300 of 2,405, counting RDEC and merged scheme claims by large companies) but about 62% of the cost (£240 million of £390 million), our arithmetic on HMRC's table. Dividing the cost by the number of claims gives roughly £160,000, but HMRC reports that 6% of all claims account for 69% of total value, so that average is not a guide to a typical claim.
When does construction work count as R&D?
HMRC's guidelines (CIRD81910) ask whether a project sought an advance in science or technology and faced an uncertainty that a competent professional could not readily resolve. The production of goods and services is excluded, and so is work on the financial, marketing and legal aspects of a project (paragraphs 28 and 37). For construction that means the building itself is production, and the R&D, where it exists, is the part that had to be worked out first.
| Situation | How HMRC's guidance treats it | Where |
|---|---|---|
| Working out how to meet a structural, thermal, acoustic or performance target when the route is not readily deducible | Can be R&D if the design work directly contributes to resolving the uncertainty | CIRD81910 para 41 |
| Combining standard building systems or components when how to integrate them is not readily deducible | Can involve system uncertainty even if the principles of integration are well known | CIRD81910 paras 29 and 30 |
| A test rig, mock-up or trial element built solely to resolve the uncertainty | A prototype or pilot plant is R&D until the uncertainty is resolved, then further work is not | CIRD81910 paras 39 and 40 |
| An architect designing a carbon-neutral building with some novel design features | The practice can claim the cost of making the advances, not its total spend on the customer's brief | CIRD81350 services example |
| Applying a known method to a new site | Adapting an existing product or process routinely is not an advance | CIRD81910 para 12 |
| Aesthetic or cosmetic design effects | Not in themselves science or technology | CIRD81910 para 42 |
| Planning, financial appraisal or legal work around the project | Not scientific or technological planning | CIRD81910 para 37 |
| Snagging and defect rectification after hand-over | Routine fault fixing is not R&D, though a new problem with real uncertainty may be | CIRD81910 para 35 |
Does Meeting Part L or a Low-Carbon Target Count as R&D?
Not automatically, and this is one of the most common false positives in construction claims. Building Regulations Approved Document L (the energy performance standard) sets a fixed compliance backstop. Meeting it using an established method, such as a standard U-value build-up, a proprietary MVHR system installed to the manufacturer's specification, or a SAP calculation run with off-the-shelf inputs, is compliance, not R&D, however much design effort it took.
The distinction the BIS Guidelines draw is the same one that applies everywhere else on this page: was there a scientific or technological uncertainty that a competent building services engineer could not resolve from published guidance, manufacturer data or established practice alone. That threshold is usually crossed when a project targets a performance level well beyond the regulatory minimum on a building type or fabric combination where the industry does not yet have a reliable, published method: a deep retrofit of a solid-wall Victorian terrace to Passivhaus EnerPHit standard where thermal bridging at existing junctions had never been modelled for that wall build-up, a novel MVHR ducting strategy for a constrained heritage floor plate, or an embodied-carbon target that required developing a bespoke low-carbon concrete mix and validating its structural performance through original testing.
HMRC's CIRD81910 test applies without modification: routine compliance work, even where it is genuinely difficult to coordinate or expensive to deliver, is not R&D unless the difficulty is technological uncertainty rather than programme, cost or regulatory pressure. See our R&D tax relief glossary for the working definitions of "advance" and "uncertainty" used throughout this test, and our R&D tax credits for cleantech page for the equivalent test applied to renewable-heat and embodied-carbon projects outside construction.
Who claims when a developer hires a contractor, the client or the builder?
This is the question that decides most construction claims. For accounting periods beginning on or after 1 April 2024, HMRC's rule is that generally only the party who decides to undertake or initiate the R&D can claim, and a company can claim for R&D it contracts out only if it intended or contemplated R&D of that sort (CIRD161000). Transitional provisions apply to some contracts. HMRC's examples (CIRD162000, CIRD162100) are written about construction, and are worth reading before a claim is prepared:
- The client cares only about the result. A company commissions a landmark building with demanding performance parameters. It appreciates R&D will be needed but does not specify what, how, or what advances are sought. HMRC's conclusion: the client does not meet the definition of contracting out R&D, and any claim rests with the construction firm.
- An unexpected site problem. A building contractor, under a contract that anticipated no R&D, meets an unexpected issue in the groundworks and undertakes R&D at its own expense. It can claim. If the parties later agree a contract variation that pays for that R&D, the contractor can no longer claim from that point and the developer can.
- The client brings its own experts. A software developer commissioning a bespoke building adds its own requirements for a server room. HMRC says that is not necessarily evidence the client intended R&D of the sort the builder undertakes, because the client's professionals are not competent in construction technology. By contrast, where a construction company with competent professionals in the relevant field specifies the work it passes to a contractor, that may be evidence it intended R&D, which bears on whether it can claim for the contracted-out work.
The practical lesson is to keep the contract, the variation orders and the design correspondence with the claim file. They determine whether the R&D was yours, your client's, or neither.
What about subcontractors, agency labour and overseas design?
Where you contract R&D out to an unconnected subcontractor, 65% of the part of the payment relating to R&D done in the UK is claimable. If the subcontractor is connected, the claim is the lower of your payment and the subcontractor's own relevant expenditure (CIRD138000). Staff supplied by an agency are externally provided workers: 65% of the payment attributable to qualifying earnings is potentially claimable where the parties are unconnected, and the category does not include payments to self-employed consultants (CIRD137000). R&D done only overseas is excluded unless conditions necessary for the work cannot be replicated in the UK and it would be wholly unreasonable to do so, and HMRC disregards cost and availability of workers in that test (CIRD150500).
Can materials used in trials or built into the project be claimed?
Consumable items used directly in qualifying R&D can be claimed, including water, fuel and power, apportioned where partly used for other purposes (CIRD136000). The exception that matters on a construction project is the rule on items that are sold or transferred: where a company transfers ownership of items produced in the course of its R&D as part of its ordinary business, the cost of consumables forming part of those items is excluded. HMRC's examples concern a kiln sold after testing and soft drinks bottled after pipework trials. Applying the same principle, materials incorporated into a building handed to a client are at risk of exclusion, while materials in a test panel that is scrapped or retained for further trials continue to qualify. Keep records of where each trial item ended up.
What about buildings, test facilities and contaminated land?
R&D tax relief does not cover capital expenditure (CIRD81700). Capital spending on R&D facilities may qualify for the R&D allowance at 100% for a trader whose R&D relates to its trade. HMRC's examples treat a laboratory building as qualifying but not the land it stands on, and the allowance excludes dwellings (CA60300, CA60500).
Land remediation relief is a separate corporation tax relief. For land acquired in a contaminated state, or long-term derelict land brought back into use, a company gets a deduction of 100% plus an additional 50% of qualifying expenditure (CIRD60015, CIRD60020). An election is needed to treat capital expenditure as deductible, within two years of the end of the accounting period (CIRD60075). It cannot be made where the expenditure qualifies for capital allowances, including R&D allowances (CIRD60085). It does not apply where the company or a connected party caused the contamination or dereliction (CIRD60100). A loss-making company can surrender the related loss for a cash payment.
How are staff and software costs treated?
Only the costs of directors and employees directly and actively engaged in qualifying R&D count, in the proportion of their time spent on it, and that is a question of fact based on duties, not job titles (CIRD133000). Software, including modelling and analysis tools, is claimable where employed directly in qualifying R&D, with apportionment where it is shared, and HMRC accepts a pragmatic basis such as staff numbers (CIRD134000).
How is the credit calculated, and what must be filed?
For periods beginning on or after 1 April 2024, most companies claim the merged scheme's taxable 20% expenditure credit. Loss-making SMEs whose qualifying R&D is at least 30% of total expenditure can use ERIS: an extra 86% deduction and a payable credit worth up to 14.5% of the surrenderable loss (HMRC guidance on the merged scheme and ERIS). The credit is capped by reference to PAYE and National Insurance liabilities, at £20,000 plus 300% of the relevant liabilities unless exempt (CIRD140000). As arithmetic only, £100,000 of qualifying expenditure gives a £20,000 merged credit, about £15,000 after tax at the 25% main rate (gov.uk corporation tax rates).
A claim notification form is needed first for first-time claimants or those who have not claimed in the previous three years, within six months of the end of the period of account. An additional information form must be submitted before or on the day the company tax return is filed, describing for each project the baseline, the advance sought and the uncertainties faced. HMRC estimates error and fraud in R&D reliefs for 2023 to 2024 at 6.4% of the cost of the reliefs (HMRC Annual Report and Accounts 2025 to 2026). For a contractor, the usual weak points are the contract position, the line between building and R&D, and capital items.
Where next?
The eligibility calculator gives an indicative figure from your own numbers and the statistics page sets out HMRC's totals. See also the guides for engineering and manufacturing firms, the explainers on subcontractors and consumables, and the industry hub. If you think a project on your books involved real technical uncertainty, request a free assessment and we will tell you whether it looks worth taking to a specialist.
If you are a newly appointed finance director, see our complete guide to R&D tax relief for a new finance director for what to check on an inherited claim.