Industry Guide

R&D Tax Credits for UK Manufacturers

HMRC's September 2026 statistics record 11,090 R&D tax relief claims from manufacturing companies for 2024 to 2025, costing £2,235 million, more than any other sector (HMRC, Research and Development Tax Credits Statistics, September 2026). The hard part for a factory is not finding R&D, it is separating the work that sought an advance from the production that surrounded it.

Last reviewed: 12 min read
11,090
manufacturing R&D claims, 2024 to 2025 (HMRC, September 2026)
£2,235m
cost of those claims, the largest of any sector
20%
merged scheme expenditure credit rate (taxable)
65%
of an unconnected UK contractor payment that is claimable

Quick Answer: Yes, if the work sought a technological advance that a competent engineer could not readily work out, such as a new process, material or tooling approach. Routine production does not qualify. For accounting periods beginning on or after 1 April 2024, most manufacturers claim through the merged scheme, a taxable expenditure credit of 20% of qualifying costs.

How much R&D tax relief do UK manufacturers claim?

Manufacturing is the biggest sector in HMRC, Research and Development Tax Credits Statistics, September 2026, ahead of professional, scientific and technical activities and information and communication. HMRC assigns each claim to a sector using the company's registered primary SIC code, so a company classed as manufacturing may carry out its R&D in a different field, and the reverse.

Sector (HMRC) Claims, 2024 to 2025 Cost of relief R&D expenditure
Manufacturing 11,090 £2,235m £14,195m
Professional, scientific and technical 8,195 £1,960m £11,665m
Information and communication 10,920 £1,630m £9,950m
Construction 2,405 £390m £2,510m
All sectors 40,325 £8.2bn £51.0bn

Source: HMRC, Research and Development Tax Credits Statistics, September 2026, table RD6 (industry sector analysis) and the key points. 2024 to 2025 is provisional and HMRC has uplifted it for claims not yet received. All figures are rounded by HMRC to the nearest 5 or £5 million.

The trend inside manufacturing is fewer, larger claims. The same release shows manufacturing claims falling from 19,370 in 2021 to 2022 to 11,090 in 2024 to 2025, a drop of about 43%, while the cost of relief rose from £1,770 million to £2,235 million, about 26% higher (our arithmetic on HMRC's table). Large-company claims carry most of the value: of the 11,090 claims, 1,315 were RDEC or merged scheme claims by large companies (about 12% of claims), and they cost £1,520 million (about 68% of the sector's cost). Dividing the sector cost by the number of claims gives roughly £200,000, but HMRC reports that 6% of all claims account for 69% of total value, so that mean says little about what a 60-person subcontractor should expect.

What counts as R&D on the factory floor, and what is just production?

HMRC's tests are in its guidelines on the meaning of R&D (CIRD81910). The work must seek an advance in science or technology and face an uncertainty that a competent professional could not readily resolve. The production and distribution of goods is expressly excluded (paragraph 28(c)), and HMRC's separate guidance on production (CIRD81350) explains how to split a project that mixes the two. The table below sets out how that guidance treats common factory situations.

Situation How HMRC's guidance treats it Where
A trial run to find out whether a new process works, with the uncertainty still open Trial costs are allowable up to the point the uncertainty is overcome, apportioned on an appropriate basis CIRD81350 para 15
A trial run to validate a process where no uncertainty remains Not R&D CIRD81350 para 15
A prototype built solely for the R&D project, not for sale Generally within R&D until modifications from testing are made and further testing is satisfactory CIRD81350 paras 18 and 19; CIRD81910 para 39
A first-of-class unit built to a customer order Only the costs of activities that directly resolve the uncertainty qualify, not the total build cost CIRD81350 paras 20 to 23
Optimising or fine-tuning without materially changing the underlying technology Not an uncertainty for R&D purposes CIRD81910 para 14
Turning a proven concept into a cost-effective, reliable, reproducible process A common source of qualifying uncertainty where the route is not readily deducible CIRD81910 para 13
Combining standard machines or controls where how to integrate them is not readily deducible Can involve system uncertainty even if the components are well known CIRD81910 paras 29 and 30
Fixing faults after a product has gone into production Routine fault fixing is not R&D, but a new problem involving real uncertainty may be CIRD81910 para 35
New colour, label or finish with the same product and process Cosmetic and aesthetic work is not in itself R&D CIRD81910 para 42

One idea runs through all of these: the claim is about the uncertainty, not the department. A welding procedure for an unfamiliar alloy can qualify while the next hundred welds made to that procedure do not.

Do production trials, scrap and first-of-class builds qualify?

Partly, and the split is the whole skill. HMRC's guidance on manufacturing trials says that where trials are needed to test whether an advance has been made, the whole or part of the cost may be R&D depending on how much uncertainty remains at that stage, and that it is unlikely the whole end-to-end process contributes to resolving it. HMRC's worked example is a multi-day manufacturing trial to confirm that a process change delivers acceptable quality and quantity: the costs are allowable only up to the point the uncertainty has been overcome (CIRD81350, paragraphs 11 to 17).

For a one-off machine built to a customer order, HMRC's example allows the company to claim the costs of making the advances and overcoming the uncertainties, not the total cost of meeting the customer's requirements. Design, build and test of versions of a sub-assembly can qualify, and the consumables used in that work qualify, apart from those in the sub-assembly as finally fitted to the product.

Which materials and utilities can a manufacturer claim?

Consumable items used directly in qualifying R&D can be claimed. The category covers items that are consumed or transformed and expressly includes water, fuel and power of any kind, but not software (CIRD136000 for periods beginning on or after 1 April 2024, CIRD82300 for earlier ones). Two rules matter most to a factory.

  • Materials that end up in goods you sell are excluded. Since 1 April 2015 the cost of a consumable that forms part of an item sold or transferred in the ordinary course of business is not claimable. HMRC's example is a soft drinks producer testing new pipework: the water that passes through the trial pipes is bottled and sold, so its cost is excluded (CIRD136000).
  • Apportion where only some output is sold. If part of a trial batch is retained for further trials or disposed of as sub-standard, that part continues to qualify. HMRC's guidance also says that where sub-standard output is sold as scrap, the consumable costs remain R&D expenditure (CIRD81350, paragraph 17).

For power and water that are not separately metered, HMRC accepts a pragmatic apportionment, for example by floor area or staff numbers, and says that if a company offers a reasonable basis it does not expect detailed enquiries to find a slightly more accurate one.

Can a contract manufacturer claim for work done for a customer?

This is where many factory claims are won or lost. For accounting periods beginning on or after 1 April 2024, HMRC's rule is that generally only the party who takes the decision to undertake or initiate the R&D can claim (CIRD161000). If your customer contracts out R&D to you, the customer may claim and you may not. If you do R&D to deliver an ordinary order that the customer never intended to involve R&D, you may claim. Transitional provisions apply to some contracts.

HMRC's detailed examples (CIRD162100) include two that read like factory floor situations:

  • A manufacturer asks a supplier for prototype tooling, knows R&D is likely to be needed, but lacks the expertise to specify it, while the supplier works at a loss and carries the commercial risk. HMRC's conclusion is that the supplier is in a position to claim.
  • A chemicals company contracts a second producer to make an intermediate. The second producer has a different process train and must develop its own process, and the customer cannot specify the R&D required. Again, HMRC concludes the producer is in a position to claim.

The practical point is to read the contract and the correspondence before the claim is written. Who specified the R&D, who carried the risk, and who could have described the advance sought are the facts HMRC's examples turn on.

What if we subcontract prototyping, machining or testing?

Payments to an unconnected contractor for R&D you contracted out are claimable at 65% of the relevant portion, and the relevant portion is the part that relates to R&D in the UK (CIRD138000). Where the contractor is connected, the claim is the lower of your payment and the contractor's own relevant expenditure. Contractor payments that the contractor passes to someone else do not count in that connected calculation. A similar 65% applies to the part of an unconnected staff provider's charge that relates to qualifying earnings for externally provided workers (CIRD137000).

R&D carried out only overseas is excluded unless it falls within the exception in section 1138A of the Corporation Tax Act 2009: conditions necessary for the R&D that are not present in the UK and that it would be wholly unreasonable to replicate here. HMRC lists geographical, environmental and social conditions, and legal or regulatory requirements, and says cost and the availability of workers are disregarded. Its example is motorsport testing restricted by regulators to particular tracks, normally overseas (CIRD150500, CIRD151000). A cheaper prototype run abroad will not meet that test.

Can we claim for machines, tooling and production lines?

Not under R&D tax relief. Expenditure must be allowable as a deduction in computing profits, so capital expenditure is excluded, and the accounts treatment does not settle whether something is capital for tax (CIRD81700). Capital spending on R&D may instead qualify for the R&D allowance, which is given at a rate of 100%, only to traders, and only where the R&D is related to the trade (CA60100, CA60500).

How much of an operator's or engineer's time can be claimed?

Only the staffing costs of directors and employees directly and actively engaged in qualifying R&D, and where someone is engaged part of the time, only the appropriate proportion. HMRC says whether a person is directly and actively engaged, and to what extent, is a question of fact based on the duties performed and not on the job title (CIRD133000). That cuts both ways: a toolroom operator who built and ran the trial fixtures can have a share, and a project engineer cannot have 100% just because the project was labelled R&D. Qualifying indirect activities such as maintenance and security of R&D facilities count only where they are specifically identifiable as part of the project.

How is the credit calculated for a manufacturer?

For periods beginning on or after 1 April 2024, most companies claim under the merged scheme: a taxable expenditure credit of 20% of qualifying expenditure. Only loss-making R&D-intensive SMEs can use ERIS, which gives an extra 86% deduction (186% in total) and a payable credit worth up to 14.5% of the surrenderable loss. The intensity condition is that qualifying R&D is at least 30% of total expenditure, counting connected companies. A company that qualifies for ERIS may choose the merged scheme instead, but cannot claim both on the same spend (HMRC guidance on the merged scheme and ERIS). Both schemes are subject to a PAYE cap of £20,000 plus 300% of the company's relevant PAYE and National Insurance liabilities, unless the company is exempt (CIRD140000).

Because the merged credit is taxable, the net value depends on the corporation tax rate. As arithmetic only: £100,000 of qualifying expenditure gives a £20,000 credit, which is about £15,000 after tax at the 25% main rate or about £16,200 at the 19% small profits rate (gov.uk corporation tax rates). HMRC's own ERIS example has a company with a £50,000 trade loss and £100,000 of qualifying expenditure: the 86% extra deduction takes the loss to £136,000, and surrendering it at 14.5% gives a payable credit of £19,720 (CIRD122000). The eligibility calculator applies these rates to your own figures. It is an eligibility indicator, not tax advice.

What does HMRC expect with a manufacturing claim?

Two filings come before the numbers. A claim notification form is needed if the company is claiming for the first time or last claimed more than three years before the end of the claim notification period; it must be sent by six months after the end of the period of account, or the claim is invalid. It is not needed for claims made on or after 1 April 2027. An additional information form must be submitted before or on the day the company tax return is filed, or the claim will not be accepted. For each project it asks for the baseline level of science or technology, the advance sought, and the uncertainties faced, and it says a problem is not an uncertainty if it can be resolved in a discussion with peers.

HMRC takes accuracy seriously. Its annual report estimates error and fraud in R&D reliefs for 2023 to 2024 at 6.4% of the cost of the reliefs (£493 million), 11.1% for the SME scheme and 3.2% for RDEC (HMRC Annual Report and Accounts 2025 to 2026). For a manufacturer, the places the rules above bite are: production run costs mixed in with trial costs, consumables that went into goods sold, full-time apportionment for operators, capital items, contract terms that put the claim with the customer, and prototype spend abroad.

Where next?

Read the other sector guides for engineering and food and drink producers, the expense guides for consumables, subcontractors and prototypes, or check the numbers on the HMRC statistics page. The calculator gives an indicative figure, and the industry hub lists every sector guide. If your factory ran a new process, tooling or materials project in the last two years, request a free assessment and we will tell you whether it looks worth a specialist's time.

If you are a newly appointed finance director, see our new finance director's first 90 days checklist for manufacturing and engineering SMEs for a structured first-quarter review that includes R&D relief status.

Compliance note. Uplift Tax is an introducer service. We are not a tax adviser, accountant or legal firm. This page is general information drawn from HMRC's published guidance and statistics and is indicative only. Whether a particular project qualifies depends on its facts.

Use the free eligibility calculator to model your position, browse the full industries hub for other sectors including construction R&D tax credits and engineering R&D tax credits, and see the latest HMRC-sourced claim data on our R&D tax credit statistics page.

Frequently Asked Questions

Only where the improvement needed a genuine advance and the route to it was not readily deducible by a competent engineer. HMRC's guidelines say improvements, optimisations and fine-tuning that do not materially affect the underlying science or technology are not R&D, but turning something already known to be possible into a cost-effective, reliable and reproducible process can be.

Materials used up in qualifying trials can be claimed. HMRC's guidance says the consumable costs remain R&D expenditure where sub-standard output is sold as scrap, and that the part of a batch retained for further trials or disposed of as sub-standard continues to qualify. Materials that end up in goods sold in the ordinary course of business are excluded, so a clear record of what happened to each trial batch is needed.

Possibly, but the rule for contracted-out R&D decides who claims. For periods beginning on or after 1 April 2024, generally only the party that decides to undertake or initiate the R&D can claim. If the customer did not specify or intend the R&D, the manufacturer doing it may be the one entitled. If the customer did, the customer may claim and the manufacturer may not.

It can be, depending on who is treated as contracting out the R&D. Where the supplier is unconnected and the work is done in the UK, 65% of the relevant part of the payment is claimable by the party that contracted it out. In one HMRC example the supplier carries the financial risk and the customer cannot specify the R&D, and HMRC concludes the supplier, not the customer, is in a position to claim.

Not under R&D tax relief, because only revenue expenditure qualifies and capital expenditure is excluded. Capital spending on R&D may qualify for the 100% R&D allowance, which is only available to traders and only where the R&D relates to the trade. Whether an item is capital for tax is a separate question from how it is treated in the accounts.

Generally not. Payments for R&D carried out only overseas are excluded from the merged scheme and ERIS unless the conditions needed for the R&D cannot be replicated in the UK and it would be wholly unreasonable to do so. HMRC disregards cost and availability of workers when applying that test.

HMRC publishes sector totals, not typical claims. In 2024 to 2025 manufacturing made 11,090 claims costing £2,235 million, which averages about £200,000 per claim by simple division. HMRC also reports that 6% of all claims account for 69% of the total value, so a mean is a poor guide to what one company should expect.

A claim notification form first if it is a first-time claimant or has not claimed in the previous three years, and an additional information form before or on the day the company tax return is filed. For each project the form asks for the baseline level of technology, the advance sought and the scientific or technological uncertainties faced.

No, not on its own. Testing a product or process against an existing, known standard to confirm compliance is routine quality assurance, not R&D, because there is no scientific or technological uncertainty about the outcome. Work to develop a new testing method, or to resolve an unforeseen technical problem uncovered during certification testing, can separately qualify where genuine uncertainty is present.

Find Out Whether Your Factory Work Qualifies

A free written assessment from an HMRC-registered specialist will tell you whether your NPI, process or automation work qualifies, and roughly what the claim is worth under the merged scheme. No win, no fee.

Request Your Free Assessment